Steel building kits are becoming very popular option with regard to new building construction. In general, you can build a steel building kit is much faster and much cheaper than a traditional wood frame building. They are virtually maintenance-free, and smaller buildings, you do not always need to build an entrepreneur.

One detail that will have to be worked out before you build, and before you buy, we will be out of the building to be erected? Bare dirt? Concrete? Concrete foundations will increase the total cost of the project, but you may need a larger building or a structure, which will be permanent. The primary types of steel structures, which are the foundations dirt parking lot. But, depending on the local requirements, steel buildings, built on bare ground. The following information is an illustration of some details of the ground foundations and concrete foundations.

You will see that steel buildings can be fixed on the ground (without concrete), or concrete sets. Before going into details, if an area that is a frost line, you will be in about 12 “to frost line the perimeter footings. This depth is applied to the ground fixing is required in colder areas.

described below specific applications do not take into account the frost line with the requirements

ground mount (no concrete pad).

[1945901million]

  • When assembling a steel building kit to the ground, you will need to dig a post hole approximately 10 “in diameter and 30” deep every five feet or all four feet, depending on the purchase of a 5 ‘on-center system or a four “on-center system.
  • Assemble base rails ** and they Instead, mark where the holes should be dug. (16-D nail poked into the ground in the pre-drilled holes does the foot rails, is exactly that.)
  • Then use post-hole digger or auger and drill holes 30 “deep. Clean the holes.
  • you can now set up in accordance with steel kit foot rails instructions and drop to the ground anchor is pre-drilled holes. Use a 2500psi concrete (premixed bags or mix your own), and a shovel, fill the holes.
  • I have to wait at least seven days adjusted to the concrete before the assembly of the steel building

    concrete Mount.

    1. Size plate. it should be that slab 4 “wider than the width of the steel building and 6” long. it’s not broken, the edge of the disk when installing the concrete anchor dowels to floor.
    2. Concrete floor: The floor should be a minimum of 4 “thick. Stay 6 “thick if you intend to large vehicles such as trucks or larger RVs to be parked on it. The concrete must be at least 2500 psi concrete reinforcement fiberglass mesh added item # 3 rebar plant or 24” centers. You should also consider going for a 4000psi concrete mixture together with the two extra inches of concrete, if you wish to more than a normal amount of weight.
    3. absolutely saw cut expansion joints within a reasonable period of time after the pour is completed, the expansion joints or trowel, while the finish is going on.

    Footing requirements: (International Building Code in 2000 or “IBC 2000” requirements)

    However pour on the floor, you’re going to pour the footings district. This so-called monolithic pour or monolithic slab. Perimeter footings must be 12 “deep (even the four” as part of floor 12 “) and 16” wide. It will be the bases of the two # 4 rebar length of the upper and lower continuous run around the entire area.

    Our local (Tempe, Arizona), the footings would cost about $ 11.50 per lineal (running) foot.

    That’s it. If the building department is still the UBC 1997 (Uniform Building Code), which for many of them, the funds can only be 12 “wide. It should hit the $ 1.00 lineal foot on such funds requirements for price estimate. For more information, reinforced concrete buildings, please contact Absolute steel & storage then the Spirit. several pages of technical information to help there

    See pictures = ** putting together the foot rails here Assemble base rails

    .